The Clewiston News

Flaghole Road from Woodland Boulevard to US 27

Construction Project: Crews are preparing to resurface Flaghole Road from Woodland Blvd., to US 27 (approximately 5.87 miles).  The improvements include removal of an existing drainage conveyance, installation of two 72” Culverts and associated drainage improvements, roadway safety treatments, and milling and resurfacing of the roadway. The contractor is Community Asphalt Corporation. Watch for crews and equipment working close to the road. Drivers should expect daytime lane closures. Flaggers will direct motorists through the work zone in a single lane. Please observe posted speed limits and drive with caution in the construction zone. Estimated completion is summer 2017.